M-113B is the same as M-113A, but with a sharper bending peak.
This pile will sharpen the groove initially formed by the M-113A.
Like the M-113A, the M-113B can be installed in multiple directions of the stakeholder.
The direction chosen depends on the orientation of the groove.
(bookable)